20 Crystal Street

This page allows future tenants to view the progress of the building located in the Village of Monticello, NY. Questions? Please call Mark at 845-798-9977. We have 24,000 sq ft available. The building is 100% ADA compliant with an elevator and 3 handicapped exits. The pictures start with the most current.

'
'


56
'

55
'

54
'

53
Porches and ramps added Jan 2010.
'

52
Rear Sided. Parking Lot Graded. Nov 15, 2008.
'

52
Front Sided. Nov 15, 2008.
'

51
Front Sided. Windows Installed. Low E, Argon Filled. Nov 15, 2008.
'

50
Roof finished. May 15.
'

49
View from Crystal Street - Front of building. April 30.
'

48
View from Parking Lot - Back of building. April 30.
'

47
View from Crystal Street - Front of building. April 30.
'

46
View from Crystal Street - Front of building. April 18.
'

45
April 18.
'

44
View from parking lot. April 18.
'

43
Willow has decided that she wants the entire building.
'

42
Begining of April 2008.
'

41
Finishing up the sheathing. End of March 2008.
'

40
The roof trusses end of March 2008.
'

39
The roof trusses end of March 2008.
'

38
The roof trusses end of March 2008.
'

37
The roof trusses end of March 2008.
'

36
The roof trusses end of March 2008.
'

35
The roof trusses are lifted into place at the end of March 2008.
'

34
Each roof truss is 80 feet long and 10 feet high. March 2008.
'

33
The roof trusses arrive. March 2008.
'

32
Second floor walls complete by mid March 2008.
'

31
First floor during the wet month of February. Feb 2008.
'

30
The second floor deck complete. This space is free of structural posts - 150 feet by 80 feet. March 2008.
'

29
The existing RSS building with the new one behind. Feb 2008.
'

28
View from the street after the 2nd floor trusses are in place. Feb 2008.
'

27
Second floor trusses. Feb 2008.
'

26
Second floor trusses are in place. Feb 2008.
'

25
First floor walls with the numerous large window openings. Jan 2008.
'

24
The steel is prepared to hang the 2nd floor trusses. Jan 2008.
'

23
Walls go up quickly and the steel frame for the second floor is welded into place. Jan 2008.
'

22
Walls are framed on the deck and lifted into place. Jan 2008.
'

21
With a break in the weather, the backfilling is finished. Jan 2008.
'

20
The first floor is framed. Jan 2008.
'

19
By Christmas, most of the trusses are in place for the first floor. Dec 25, 2007.
'

18
With the steel finished the floor trusses are installed. In the background is the elevator shaft foundation. Dec 2007.
'

17
The gravel is atop a continuous row of infiltrator drainage to assure that an excess volume of water can move quickly to daylight. Approximately 4000 square feet of water can be held under the foundation to allow it time to return to the ground. Dec 2007.
'

16
The black filter fabric keeps the soil from mixing with the gravel. Dec 2007.
'

15
One foot of gravel is installed next to the foundation for roof drainage. A steel plate separates soil from the gravel during backfilling. Dec 2007.
'

14
Concrete is waterproofed with tar. Dec 2007.
'

13
Walls are finished and the steel superstructure is welded into place. Dec 2007.
'

12
These forms will be disassembled the day after Thanksgiving and reassembled to finish pouring the walls next week. End of Nov 2007.
'

11
The force of concrete coming out of the rubber hose can knock you off the wall. Nov 2007.
'

10
Today more than half the walls are poured by 12 concrete trucks. Nov 2007.
'

9
The walls are 12 inches wide and 8 feet tall. Nov 2007.
'

8
A concrete pumping truck is used to fill the forms. The remote controlled arm can reach more than 125 feet. Nov 2007.
'

7
Walls are formed. At 150 feet long, straight and square are very important. Nov 2007
'

6
The gravel is leveled at a depth of 1 foot. Nov 2007.
'

5
Many trucks haul away 350,000 yards of soil from the excavation. Nov 2007
'

4
The footings are poured and 550 Tons of gravel delivered to assure a dry basement. The slab will be poured over the gravel which is one foot deep. Nov 2007.
'

3
The hole has begun for the foundation of 20 Crystal Street. Oct 2007
'

2
Tree removal in progress for the future parking lot. Sept 2007
'

1
The existing building occupied by RSS (#22) with the lot next door yet untouched. Sept 2007.
'